& c, Zhengzhou Xileduo bumper car manufacturer, in line with the attitude of being responsible to customers, writes about the installation and debugging methods of bumper cars. Here, I mainly use the ground network bumper cars as an example to explain to you. I hope that the majority of friends who are experienced in Perak bumper car operators can Learn something from it. Insert the special key into the electric control lock and turn it clockwise. At this time, the "Power" indicator light is on, press the "Start" button, the "Run" indicator light is on, and adjust the voltage through the voltage regulator on the electric control cabinet panel. The switch appropriately adjusts the working voltage at that time so that the working voltage of the bumper car is adjusted between. The "working voltage" meter on the cabinet will correspondingly indicate the voltage value supplied to the upper and lower electrodes of the car park. At this time, if there is a bumper car started on the parking lot, the "working current" meter will have a corresponding current indication. Press the "Emergency Stop" button, the button will lock itself, and the electrical control cabinet will immediately stop sending out DC power. To restart the electric control cabinet to send out DC power, the "Emergency Stop" button must be unlocked in advance (the method of unlocking: hold the "Emergency Stop" button and turn it clockwise). The timing control running time of the bumper car electric control cabinet is at the factory. It has been set to minutes. If the user needs to increase or decrease the running time, he can adjust the required time by himself (when adjusting the time, all power needs to be cut off). The electric control cabinet is equipped with overcurrent protection devices, which have been debugged before leaving the factory. The user does not need to make any adjustments. Phone: : Mobile:
Bumper cars, Skynet bumper cars, Ground net bumper cars prices